Case study
ESP Health Check module
On a field in North America, the operation of an ESP well stock was optimised: the Health Check module assessed the stability of each pump stage by stage and gave early warning of gas lock caused by free gas.
Optimisation target
- Location
- North America
- Lift method
- ESP wells
The problem
Starting point
The wells operated with free gas at the pump intake. An electric submersible pump is designed to move liquid, and with a large gas fraction its lower stages stop producing head. Gas accumulates in the pump, flow breaks down, and running in this condition leads to shutdowns, motor overheating and premature equipment failure.
Standard telemetry shows the approach to gas lock late, when production is already falling. An assessment was needed that would show the pump's stability margin in advance and allow the operating conditions to be changed before a failure.
Solution
Stage-by-stage pump stability assessment
The Health Check module calculated gas fraction and head at every pump stage and compared them with each stage's free-gas stability limit. From the gas trend at the intake, it forecast how many days remained before the first stages crossed that limit.
For each well, engineers received a risk level, the number of stages at risk, the gas margin and a gas lock forecast. This made it possible to choose measures in advance: reduce drawdown, change the pump speed, set the pump deeper or install a gas separator.
Other services
IDT Engineering
Our engineers work on your well stock: well reviews, equipment selection, audits.
IDT Custom
Custom development of science-intensive solutions: calculation modules, enterprise systems and integrations for your task.
IDT Academy
Training for working with a complex well stock. Courses, practice on simulators and preparing engineers to use the IDT product line.
Leave your contact details and we'll reach out
We will explain how the Health Check module can be applied to your ESP well stock and what input data it requires.